Project Overview
Gant Industries was tasked with the buildout of a 47,000-square-foot existing warehouse to create a state-of-the-art medical research facility for Marker Therapeutics. This transformation required innovative design and construction solutions to convert the existing space into a functional and efficient research environment that met the stringent demands of the medical and biotechnology sectors.
Scope of Work
The project involved the complete buildout of the warehouse, with a focus on creating specialized spaces for medical research, including laboratories, cleanrooms, and advanced research areas. Gant Industries worked closely with the architect, PGAL, to ensure that every detail of the facility supported the operational needs of Marker Therapeutics, from precise environmental controls to efficient space management for research teams.
Key Team Members
- Brad Laskowski – Preconstruction / Estimating
Brad played a critical role in the preconstruction phase, meticulously estimating costs and developing a budget that aligned with Marker Therapeutics’ financial objectives. His expertise in resource planning and allocation ensured that the project was executed efficiently and within budget. - Bradley Rayburn – Project Management
Bradley managed the day-to-day operations of the project, coordinating between the client, the architect, and the construction team to ensure that the project progressed smoothly. His ability to manage multiple stakeholders was key to keeping the project on track and meeting the client’s expectations. - Logan Griffiths – Superintendent
As the on-site superintendent, Logan oversaw all aspects of the construction process, ensuring that timelines were met, quality standards were upheld, and that the facility was built to meet the specific requirements of a medical research environment. - Mike Brumley – Constructability / Quality Control
Mike ensured that the constructability of the project was flawless and that every element met the highest standards of quality control. His role was essential in ensuring that the facility adhered to the strict operational standards required for a medical research facility.
Building a Specialized Medical Research Facility
Converting a warehouse into a fully operational medical research facility presented a unique set of challenges. Gant Industries was responsible for integrating advanced HVAC systems, cleanroom technologies, and specialized laboratory spaces that supported cutting-edge research. The facility required strict environmental controls to ensure that research materials and operations were not compromised, and Gant Industries worked to ensure these systems were seamlessly incorporated into the existing structure.
Addressing Regulatory and Safety Requirements
Given the nature of medical research, Gant Industries adhered to all relevant regulatory standards for safety, cleanliness, and environmental control. The facility was designed and built in compliance with both local building codes and industry-specific regulations, ensuring a safe, compliant environment for scientific research and discovery.
Challenges and Solutions
The existing warehouse structure required significant modifications to meet the stringent needs of a medical research facility. Gant Industries implemented advanced construction techniques to modify the building’s infrastructure, including the installation of specialized ventilation and filtration systems to maintain sterile environments necessary for research. Our team worked closely with PGAL and Marker Therapeutics to address challenges related to space optimization and system integration, ensuring that the facility supported high-level research activities.
Results
The successful buildout of the 47,000-square-foot facility provided Marker Therapeutics with a modern, fully functional research space designed to support innovation and discovery. The facility’s flexible design and advanced systems ensure that it will serve the evolving needs of the medical research sector for years to come. Gant Industries delivered the project on time, within budget, and to the exact specifications required by the client.